commercial division

Ironline Tower

Location
Nashville, TN
Completed
2024
Scope
Ground-up Class A office
Area
240,000 sq ft

An eight-story office tower built over an occupied parking structure, with a glass curtain wall tuned to afternoon sun.

The vision

The client wanted a workplace that reads as infrastructure: honest materials, generous daylight, and a ground floor that gives something back to the street.

The execution

We phased the foundations around a live parking deck, then erected a steel frame with a two-week-per-floor cycle. Unitized curtain wall panels were pre-assembled to keep the facade weather-tight before the interior fit-out began.

Project record

Structural signature
Exposed weathering steel
Delivery
Design-build, GMP contract
Duration
26 months
Structure
Composite steel frame over existing deck
Envelope
Unitized curtain wall, low-E glass

Next step

Tell us what you’re building.

Send a site address, a rough scope and a target date. You’ll hear back from the division lead within two business days.

Start a project

Or call (615) 555-0142
Monday to Friday, 8am–5pm CT